发明名称 METHOD FOR OPERATING A POWER PLANT
摘要 Disclosed is a method for operating a power plant. The method includes providing a power target setpoint to a power plant controller; dependent on said power target setpoint, determining a setpoint of at least one first power plant operation parameter; operating the power plant at a set power output; and and with the at least one first operation parameter adjusted to the setpoint of the operation parameter, applying a measurement to determine an actual value of at least one second operation parameter. The method further includes applying a theoretical power plant model to determine an expected value of the at least one second operation parameter; comparing the expected value of the at least one second operation parameter and the measured value of the at least one second operation parameter; and applying a calibration loop for the theoretical power plant model.
申请公布号 US2017051681(A1) 申请公布日期 2017.02.23
申请号 US201615241269 申请日期 2016.08.19
申请人 General Electric Technology GmbH 发明人 ARIAS CHAO Manuel;REITER Wilhelm;LILLEY Darrel Shayne
分类号 F02C9/20;G05B13/02 主分类号 F02C9/20
代理机构 代理人
主权项 1. A method for operating a power plant, the method comprising: providing a power target setpoint to a power plant controller, dependent on said power target setpoint, determining a setpoint of at least one first power plant operation parameter, operating the power plant at a set power output and with said at least one first operation parameter adjusted to the setpoint of said operation parameter, applying a measurement to determine an actual value of at least one second operation parameter, applying a theoretical power plant model to determine an expected value of said at least one second operation parameter, comparing the expected value of said at least one second operation parameter and said measured value of the at least one second operation parameter, and applying a calibration loop for the theoretical power plant model, said calibration loop comprising: applying a comparison step to determine a deviation between the expected value of the at least one second operation parameter and the measured value of the at least one second operation parameter,modifying the theoretical power plant model,re-calculating the expected value of the at least one second operation parameter,repeating the calibration loop until a best match between the expected value of the at least one second operation parameter and the measured value of the at least one second operation parameter is achieved, andterminating the calibration loop after obtaining a calibrated power plant model.
地址 Baden CH
您可能感兴趣的专利