摘要 |
A method to manufacture native soil flowable fill includes hydro excavating native soil to form a hole at a first excavation, and transferring the native soil from the first excavation to a mixing tank. The method also includes adding a pozzolan component, cement and water to the mixing tank, mixing the native soil in the mixing tank with the added pozzolan component, cement and water to form the native soil flowable fill, and transferring the native soil flowable fill back to the first excavation and into the hole. |