摘要 |
Controlling an output of a mining system 100 includes receiving a first signal associated with a position of the shearer 125, determining the position of the shearer 125 based on the first signal, receiving a second signal associated with a load of a conveyor 300, and determining the load of the conveyor based on the second signal. The method further includes determining an output of the mining system based on the position of the shearer and the load of the conveyor and controlling a speed of the shearer based on the output of the mining system. |