发明名称 Systems and methods for batch device commissioning and decommissioning
摘要 The embodiments described herein include a system, non-transitory tangible computer-readable medium including executable code, and a method. In one embodiment, a non-transitory tangible computer-readable medium including executable code is provided. The executable code includes instructions for providing a batch commissioning system configured to operatively couple at least two field devices to a control system, and for providing a batch decommissioning system configured to operatively uncouple the at least two field devices from the control system. The executable code further includes instructions for providing a graphical user interface (GUI) configured to use the batch commissioning system, the batch decommissioning system, or a combination thereof, to select, on a display, the at least two field devices, and to communicatively interface with the control system to operatively couple, uncouple, or a combination thereof, the at least two field device from the control system.
申请公布号 US9563188(B2) 申请公布日期 2017.02.07
申请号 US201313957230 申请日期 2013.08.01
申请人 General Electric Company 发明人 Banerjee Abhik;Petzen, III John Alexander
分类号 G05B15/02;G05B19/418 主分类号 G05B15/02
代理机构 Fletcher Yoder, P.C. 代理人 Fletcher Yoder, P.C.
主权项 1. A non-transitory tangible computer-readable medium comprising executable code, the executable code comprising instructions for: providing a batch commissioning system configured to operatively couple at least two field devices to a control system; providing a batch decommissioning system configured to operatively uncouple the at least two field devices from the control system; and providing a graphical user interface (GUI) configured to use the batch commissioning system, the batch decommissioning system, or a combination thereof, to select, on a display, the at least two field devices, and to communicatively interface with the control system to operatively couple, uncouple, or a combination thereof, the at least two field device from the control system, wherein a first field device of the at least two field devices comprises a mismatch state, and wherein the mismatched state comprises a physical device (PD) tag assigned to the first field device, a permanent node ID assigned to the first field device, and no node address corresponding to a live device, and wherein the batch commissioning system is configured to transition the first field device from the mismatch state into a commissioned state if the first field device is determined to be in the mismatch state.
地址 Schenectady NY US