摘要 |
Wind Energy Converting Systems (WECS) fitted with anti-icing systems are made by using the method according to the invention in the following steps: a) prearranging a wind rotor with blades (5), an anti-icing system, and means (50, 51) for adjusting the anti-icing system; b) installing the prearranged rotor of the WECS on a test site; c) carrying out at least one operation test of the WECS; d) detecting parameters useful for determining the presence or absence of ice on the outer surface (5E) of the blades (5). If the detected parameters do not meet a predetermined target function, the method comprises additional steps of: e) performing an adjustment through said adjustment means (50, 51); repeating the previous steps from c) to e) until no ice is detected on the outer surface (5E) of the blades (5). |