主权项 |
1. A method for construction of a hybrid foundation structure, wherein the hybrid foundation structure includes:
an upper support layer disposed in a ground and extending in a first direction; and a lower support layer extending in the first direction from the upper support layer such that the lower support layer has a narrower width than the upper support layer, the method comprising: forming a bore hole in the ground while a mixture of earth, sand, and a soil-solidifying agent is injected into the bore hole to form the upper support layer and the lower support layer, wherein the earth and the sand are a mixture of slime and aggregates, the slime being produced when the bore hole is formed, and wherein forming the bore hole and injecting the mixture include ridging a first portion of the produced slime and injecting a mixture of a second portion of the produced slime, the aggregates, and the soil-solidifying agent. |