发明名称 CONSTRUCTION ARRANGEMENT AND DETACHABLE CONNECTION ASSEMBLY FOR THIS CONSTRUCTION ARRANGEMENT
摘要 The construction arrangement comprises a first construction wall (1) and a second construction wall (2). The walls (1, 2) are arranged adjacent in a vertical plane, such that the first construction wall and the second construction wall (1, 2) have an edge in contact and such that three directions (X, Y, Z) are defined, an X-direction (X) corresponding to the contact edge direction, a Y-direction (Y) corresponding to a direction perpendicular to the X-direction and contained in the vertical plane and a Z-direction (Z) perpendicular to both the X and Y directions (X, Y), such that it is a direction normal to the first and second construction walls (1, 2). The construction comprises a connection assembly capable of transmitting forces in the X and the Y direction (X, Y) between the walls (1, 2) and attachable upon a surface of the walls (1, 2) normal to the Z-direction. The connection comprises at least two tension units (3, 4), each tension unit (3, 4) comprising two connection paddles (31, 32, 41, 42), attachable upon a surface of the first and second walls (1,2) normal to the Z direction by means of detachable anchorage means (11, 12, 21, 22) and a tension shaft (5, 6) connecting the connection paddles (31, 32, 41, 42). For each tension unit (3, 4) a first connection paddle (31 41) is fixed to the first wall (1) on a surface normal to the Z-direction (Z) an a second connection paddle (32, 42) is fixed to the second wall (2) on the cited surface normal to the Z-direction (Z) such that in case of shearing efforts between the walls along the X-direction at least one of the tension units (3,4) works under tension.
申请公布号 EP3115528(A1) 申请公布日期 2017.01.11
申请号 EP20150382362 申请日期 2015.07.10
申请人 Fundacíon Tecnalia Research & Innovation 发明人 CALDERÓN URISZAR - ALDACA, Íñigo;ARAMBURU IBARLUCEA, Amaia;CHICA PAEZ, José Antonio
分类号 E04H9/02;E04B1/04;E04B1/61 主分类号 E04H9/02
代理机构 代理人
主权项
地址