发明名称 Base load estimation for a combined cycle power plant with steam turbine clutch
摘要 Systems and methods for estimating a base load in a combined cycle power plant with a steam turbine clutch (160) are provided. According to one embodiment of the disclosure, a system (100) may include a controller (700) and a processor (750) communicatively coupled to the controller (700). The processor (750) may be configured to receive operating parameters associated with a combined cycle power plant. The combined cycle power plant may comprise a gas turbine (110) permanently coupled to a generator (130) and a steam turbine (120) selectively coupled to the generator (130) via a clutch (160). The processor (750) may be further configured to receive an engagement status associated with the clutch (160) and receive first data and second data. Based on the engagement status, the processor (750) may select the first data or the second data and use that to estimate a base load. The base load estimation may be calibrated based on the operating parameters.
申请公布号 EP2835505(B1) 申请公布日期 2017.01.04
申请号 EP20140179076 申请日期 2014.07.30
申请人 General Electric Company 发明人 Chen, Yuhui
分类号 F01D15/10;F01K23/10;F02C9/00 主分类号 F01D15/10
代理机构 代理人
主权项
地址