摘要 |
PROBLEM TO BE SOLVED: To provide a frame, a frame unit, a mold for frame unit and a frame unit construction method designed to mitigate burdens in work at a construction site.SOLUTION: A net-form frame 4A for a vertical frame is used with a slope frame construction method, to be covered over a vertical reinforcing bar 3A extending in a direction of connecting a slope top and a slope toe along a slope surface N, and sprayed with a cement mixture. The frame includes: a plurality of installation wire materials 41A for the vertical reinforcing bar installed in a direction of extension of the vertical reinforcing bar 3A with an interval, each of the plurality of installation wire materials crossing over the vertical reinforcing bar 3A in a direction orthogonal to the direction of extension of the vertical reinforcing bar 3A; and a plurality of extension wire materials 41B for the vertical reinforcing bar extending in the same direction as the vertical reinforcing bar 3A and having the plurality of installation wire materials 41A for the vertical reinforcing bar connected thereto. All of the plurality of extension wire materials 41B for the vertical reinforcing bar is located above a lateral lower reinforcing bar 31B.SELECTED DRAWING: Figure 2 |