摘要 |
Method of constructing a tower with concrete tower segments. After casting and hardening of a first tower segment, a second tower segment is cast coaxially on top of the first tower segment. After hardening the second tower segment is removed from the first tower segment. The step of casting a next segment on top of an earlier cast segment can be repeated until all tower segments have been cast. Subsequently a tower is erected by stacking the tower segments with the same relative position as during casting. |