摘要 |
An air-conditioning system 1 includes a general-purpose device controller 11 which controls a general-purpose device 21 connected via a general-purpose transmission line 30 or an input/output signal line 31 and an air-conditioning facility 23 connected via a dedicated transmission line 33. The general-purpose device controller 11 includes a processing configuration unit 303 which receives a first signal corresponding to the air-conditioning facility 23 and a second signal corresponding to the general-purpose device 21 and transmits a control signal which controls the air-conditioning facility 23 and the general-purpose device 21 based on the first signal and the second signal. The processing configuration unit 303 is configured to designate the air-conditioning facility 23 which is a first control target, with a management address which is included in the first signal and designate the air-conditioning facility 23, designate the general-purpose device 21 which is a second control target, with an input/output port number which is included in the second signal and designate the general-purpose device 21, and transmit the control signal which performs ganged control of the first control target and the second control target. |