发明名称 水中基礎および水中基礎の構築方法
摘要 PROBLEM TO BE SOLVED: To provide an underwater foundation capable of: preventing a pervious asphalt mat from being damaged or washed out by smoothly releasing uplift force; and reinforcing a rubble mound.SOLUTION: An underwater foundation has a first rubble mound 13 paved with rubble stones 12; a first pervious asphalt mat 1 laid down so as to cover the first rubble mound 13; a second rubble mound 14 with the rubble stones 12 paved on the first pervious asphalt mat 1; and a second pervious asphalt mat 1 laid down so as to cover the second rubble mound 14.
申请公布号 JP6007017(B2) 申请公布日期 2016.10.12
申请号 JP20120169398 申请日期 2012.07.31
申请人 日本道路株式会社 发明人 野々田 充;岡本 信人
分类号 E02D27/52;E02B3/06 主分类号 E02D27/52
代理机构 代理人
主权项
地址