发明名称 SUBGRADE RAISING METHOD
摘要 PROBLEM TO BE SOLVED: To provide a subgrade raising method that enables a subgrade to be raised without securing a space for temporary structure.SOLUTION: A subgrade raising method includes the steps for: installing a track skeleton support plate 10 underneath a track skeleton 1 laid on a subgrade 2; embedding a pile material 20 underground in a vertical direction through a through-hole 11a formed in the track skeleton support plate 10; connecting a raising pile material 30 in a vertical direction at a top end of the pile material 20 embedded underground, the raising pile material reaching a desired raising height; pulling the track skeleton support plate 10 upward along the raising pile material 30; and fixing the track skeleton support plate 10 on a top end of the raising pile material 30. The subgrade 2 that supports the track skeleton 1 is raised by the subgrade raising method, thereby constructing a railway track 100.SELECTED DRAWING: Figure 1
申请公布号 JP2016172970(A) 申请公布日期 2016.09.29
申请号 JP20150052801 申请日期 2015.03.17
申请人 EAST JAPAN RAILWAY CO 发明人 KATSUYAMA NATSUKI;TATSUKI SHINICHI;IWATA MICHITOSHI
分类号 E01B37/00 主分类号 E01B37/00
代理机构 代理人
主权项
地址