The gas and steam turbine plant (1) has a fuel pre-heating device (16) upstream to burners of a gas turbine (2), where a waste heat steam generator (20) is provided on an exhaust gas side downstream to the gas turbine. The steam turbine comprises a number of compression stages, where a steam pipe (60) connects a steam outlet lying between two compression stages with a steam drum assigned to one fuel pre-heating device. An independent claim is included for a method for starting a gas and steam turbine plant.
申请公布号
EP2138677(B1)
申请公布日期
2016.09.28
申请号
EP20080007315
申请日期
2008.04.14
申请人
SIEMENS AKTIENGESELLSCHAFT
发明人
BEUL, ULRICH;HEUE, MATTHIAS;HOFBAUER, THOMAS, DR.;HOFFACKER, RALF;KAUFMANN, CARSTEN;KNUDSEN, DIRK;KUNZE, MARKUS