发明名称 繊維補強コンクリートの打設管理方法
摘要 PROBLEM TO BE SOLVED: To provide a placing management method capable of effectively reduce labor and trouble of managing a slump flow value to be kept in a suitable value, in the placing site at which fiber reinforced concrete is pressure-fed with a pump and placed.SOLUTION: A placing management method for fiber reinforced concrete includes: calculating, as a regression line 13, a correlation relationship between an on-site arrival time slump flow value of concrete before being injected with reinforced fiber and a slump loss as a reduced amount of the slump flow amount after being mixed with reinforced fiber; on the basis of the correlation relationship, setting an on-site arrival time suitable upper limit value 11a and an on-site arrival time suitable lower limit value 11b, between an on-site arrival time management upper limit value 10a and an on-site arrival time management lower limit value 10b; and, for the concrete having the on-site arrival time slump flow value between the on-site arrival time suitable upper limit value 11a and the on-site arrival time suitable lower limit value 11b, pressure-feeding with a pump and placing the concrete without performing a slump flow test, after being injected with the reinforced fiber and being mixed while being kneaded.
申请公布号 JP5972843(B2) 申请公布日期 2016.08.17
申请号 JP20130176413 申请日期 2013.08.28
申请人 株式会社奥村組 发明人 松田 敦夫;吉國 一久
分类号 E21D11/10 主分类号 E21D11/10
代理机构 代理人
主权项
地址