发明名称 高炉への原料装入方法
摘要 PROBLEM TO BE SOLVED: To provide a method for charging a raw material into a blast furnace capable of securing permeability even when performing operation of breathing a large amount of fine coal powder and improving stabilization and heat efficiency in blast furnace operation.SOLUTION: In a method for operating a blast furnace by charging a blast furnace charging raw material comprising ore raw materials such as a sintered ore, a pellet and a massive ore, and a coke into the blast furnace by using a swivel chute, when the blast furnace charging raw material is charged into the blast furnace, not only a center coke layer is formed at the axial center part of the blast furnace but also a peripheral coke layer is formed around the periphery in the furnace wall of the blast furnace. Moreover, a mixing layer of the ore raw materials and the coke is formed in the area between the center coke layer and the peripheral coke layer.
申请公布号 JP5966608(B2) 申请公布日期 2016.08.10
申请号 JP20120114960 申请日期 2012.05.18
申请人 JFEスチール株式会社 发明人 石井 純;廣澤 寿幸;市川 和平;渡壁 史朗;佐藤 道貴
分类号 C21B5/00;C21B7/20 主分类号 C21B5/00
代理机构 代理人
主权项
地址