摘要 |
PROBLEM TO BE SOLVED: To increase the amount of production of products by performing the operation in which, when a failure occurs in a device used in each process in a production line, the device is early restored.SOLUTION: The charge determination device 20 determines an operator in charge of restoration of a device undergoing a failure, on the basis of a moving period in which the operator moves from the existing position of the operator to the device undergoing the failure and the restoration period required for the restoration calculated from the learning level of the operator about the device undergoing the failure. |