发明名称 高炉操業方法
摘要 PROBLEM TO BE SOLVED: To establish a method for stably operating a blast furnace with improved air permeability inside the furnace by preventing reduction powdering of charged raw materials at a blast furnace shaft.SOLUTION: A blast furnace operating method adjusts retention time of charged raw materials passing through a temperature range of 800 to 1000°C when the charged raw material move down by blowing a preheating gas into the blast furnace from its shaft part. The retention time of the charged materials passing through the temperature range of 800 to 1000°C is 60 minutes or more and the 100 Nm3/t or more of heat gas at a temperature of 950°C or more is blown. The charged raw materials is a sinter and/or an iron ore, and a fine coal and/or a reductant are blown from a charging tuyere of the blast furnace.
申请公布号 JP5962912(B2) 申请公布日期 2016.08.03
申请号 JP20120181664 申请日期 2012.08.20
申请人 JFEスチール株式会社 发明人 町田 智;澤 義孝
分类号 C21B5/00 主分类号 C21B5/00
代理机构 代理人
主权项
地址
您可能感兴趣的专利