发明名称 PROCESS METHOD FOR BUILDING FLOOR BACKFILL SPACER AND STRUCTURE OF BUILDING FLOOR BACKFILL SPACER
摘要 A process method for a building floor backfill spacer with foamed concrete as the bottom layer of the building floor backfill spacer. The method comprises: filling the ground with foamed concrete to form a foamed concrete layer (1); treating the surface of the foamed concrete layer (1), and applying composite mortar on the treated surface of the foamed concrete layer (1) to form a high-strength solidified protective layer (2). Also disclosed is a structure of the building floor backfill spacer. The structure of the building floor backfill spacer comprises the foamed concrete layer (1), a treating interface layer formed on the treated surface of the foamed concrete layer (1), and the high-strength solidified protective layer (2) formed by the composite mortar. The structure of the building floor backfill spacer is light and capable of insulating sounds, protecting the environment and saving energy, and can effectively avoid the phenomena of cracking, dusting, hollowing and the like.
申请公布号 WO2016095756(A1) 申请公布日期 2016.06.23
申请号 WO2015CN97088 申请日期 2015.12.11
申请人 BEIJING HUATAI SHENG LONG BUILDING ENERGY SAVING TECHNOLOGY CO. LTD. 发明人 ZHAO, WEIFENG
分类号 E04F15/12 主分类号 E04F15/12
代理机构 代理人
主权项
地址