摘要 |
The method involves arranging one or more alignment attachments (8) at connection pipes (9) for performing a mechanical positioning before installation of the pipes in installation areas. The pipes are positioned in an installation position by using a laying technique. A pipe-laying manipulator (7) is used as the laying technique. |