发明名称 METHOD FOR OPERATING A STEAM TURBINE PLANT
摘要 A method for operating a steam turbine plant including a steam turbine and a steam generator allows a power reserve to be provided whilst simultaneously maintaining a high level of efficiency in the normal mode of operation. The steam turbine plant includes a heat reservoir which is associated with the steam turbine, from which the steam is removed and is fed to the steam turbine. The steam is fed to the steam turbine when the steam generator is not in operation.
申请公布号 EP3025031(A1) 申请公布日期 2016.06.01
申请号 EP20140771224 申请日期 2014.09.10
申请人 SIEMENS AKTIENGESELLSCHAFT 发明人 LENK, UWE;TREMEL, ALEXANDER
分类号 F01K3/00;F01K7/22;F01K13/02;F01K23/10 主分类号 F01K3/00
代理机构 代理人
主权项
地址