发明名称 EARTH RETAINING METHOD AND EARTH RETAINING UNIT
摘要 PROBLEM TO BE SOLVED: To provide a safe earth retaining method that prevents a collapse of an excavation groove with an even greater certainty, in an excavation work in which a prescribed construction work is performed while cutting the excavation groove, in a construction work space adjacent to the excavation groove.SOLUTION: An earth retaining method is used when a prescribed construction work is performed in a construction work space 34 adjacent to an excavation groove 3, while cutting the excavation groove 3 for the construction work from a ground surface 30. An earth retaining unit is installed inside the excavation groove 3 as the cutting work progresses, the earth retaining unit having an earth retaining wall that covers three surfaces of the excavation groove 3, among excavated wall surfaces of the excavation groove except for a construction work surface 10 facing the construction work space 34. The construction work is performed in the construction work space 34 from inside the excavation groove 3, while supporting with the earth retaining unit earth pressure P from three surfaces except the construction work surface 10.SELECTED DRAWING: Figure 5
申请公布号 JP2016084623(A) 申请公布日期 2016.05.19
申请号 JP20140218314 申请日期 2014.10.27
申请人 HAYASE KOGYO CO LTD 发明人 HAYASE HIDEHIKO
分类号 E02D17/08 主分类号 E02D17/08
代理机构 代理人
主权项
地址