发明名称 |
METHOD FOR CONTROLING RAIL DISASSEMBLE AND ASSEMBLE |
摘要 |
Provided is a method for controlling rail disassembly and assembly, comprising the steps of; transmitting an entrance control signal to a preceding train terminal and a following train terminal, if a train assembly section on a railroad is unoccupied; controlling to register the following train terminal as a preceding train terminal when a preceding train and a following train enters the train assembly section; calculating an assembly expected site and an assembly expected time based on locations of the preceding train and the following train and a rate of movement, and the distance of the train assembly section; transmitting the rate of movements based on the calculated assembly expected site and the calculated assembly expected time, to the preceding train and the following train; and updating state data of the preceding train and the following train if a train assembly signal is received from the preceding train terminal. The method for controlling rail disassembly and assembly according to the present invention can remove train delay caused by train interval maintenance, and enhance user convenience in a rush-hour. |
申请公布号 |
KR20160055508(A) |
申请公布日期 |
2016.05.18 |
申请号 |
KR20140155402 |
申请日期 |
2014.11.10 |
申请人 |
KRRI |
发明人 |
CHOI, DON BUM;LEE, KANG MI;OH, SEH CHAN;PARK, CHAN KYOUNG |
分类号 |
B61L23/00;B61L23/34;B61L27/00 |
主分类号 |
B61L23/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|