发明名称 発電プラントおよびその運転方法
摘要 PROBLEM TO BE SOLVED: To obtain a time to spare for performing the confirmation of a sea water leaking event and proper determination while stopping the spread of sea water contamination if there is the suspicion of sea water leaking in a condenser, and to enable early recovery.SOLUTION: A power generation plant 1 includes a boiler 2 for generating steam, a steam turbine 3, a condenser 5 causing exhaust steam from the steam turbine 3 to be condensed by being cooled by sea water, sea water leakage detection means 34A to 34D, 56A to 56D for detecting the sea water leakage of the condenser 5, a water supply system 6 for delivering a condensate condensed by the condenser 5 as feed water to the boiler 2, a spray piping 28 for supplying feed water before heating that flows through the water supply system 6 to the steam turbine 3, a pure water tank 37, a first pure water supply piping 38 extending from the pure water tank 37 and for supplying pure water to the spray piping 28, and a control device 36 receiving an input signal from the sea water leakage detection means 34A to 34D, 56A to 56D and controlling the supply of the pure water to the spray piping 28.
申请公布号 JP5916431(B2) 申请公布日期 2016.05.11
申请号 JP20120036439 申请日期 2012.02.22
申请人 三菱重工業株式会社 发明人 西 賢祐;馬渡 憲次;龍原 潔;佐尾 俊生;西野 隆
分类号 F01K9/00;F01D25/00;F28B1/02;G01M3/04 主分类号 F01K9/00
代理机构 代理人
主权项
地址