发明名称 Operation scheduler for a building automation system
摘要 A computer-implemented method for managing and controlling multiple automation components coupled via a building automation network. The computer implemented method includes receiving, via the building automation network, a first operational schedule from a first automation device where the first operational schedule is formatted according to a first protocol, receiving, via the building automation network, a second operational schedule from a second automation device where the second operational schedule is formatted according to a second protocol, converting the received second operational schedule from the second protocol to the first protocol, generating a unified schedule that includes the first operational schedule and the converted second operational schedule, and displaying the unified schedule in a user accessible manner.
申请公布号 US9338238(B2) 申请公布日期 2016.05.10
申请号 US201113310484 申请日期 2011.12.02
申请人 Siemens Industry, Inc. 发明人 Spears Lonnie Douglas;Koerner Charles James;Marchi Michael J.;Nickels Patrick M.;Baum Michael J.
分类号 G01M1/38;H04L29/08;H04L12/28 主分类号 G01M1/38
代理机构 代理人
主权项 1. A building automation control system configured to manage and control multiple automation components coupled via a building automation network, the building automation control system comprising: a processor; a memory in communication with the processor, the memory configured to store a building automation control tool as one or more processor implementable instructions and wherein the processor implementable instructions are configured to: receive a first operational schedule related to operation of a first automation device, the first operational schedule comprising a first start time and a first stop time for the first automation device, and a report or collection routine start time;receive a second operational schedule comprising a second start time and a second stop time related to the operation of a second automation device;recognize the first and second start and stop times associated with the first and second operational schedules, respectively; andgenerate a unified schedule that: displays the first operational schedule as a first time period that extends between the first start time and the first stop time, and a point when the report or collection routine starts; anddisplays the second operational schedule as a second time period that extends between the second start time and the second stop time, wherein the second time period is aligned relative to the first time period.
地址 Alpharetta GA US