发明名称 METHOD AND APPARATUS FOR ASSEMBLY OF A SHORING TOWER
摘要 Method for assembly of a shoring tower (26), which can be used for fabrication or reconstruction of buildings, comprising shoring struts (27) being connected with each other and at least one deck (1)—for providing an area indented to be accessible in a shoring level (0, I, II, IV)—, wherein the deck (1) comprises at least one insertion hook (3)—for hanging up on a particularly horizontal shoring strut (27)—at a first front side (28) and an opposite second front side (29), characterized in that in a first step, a separate lifting and holding tool (20) being hookable in and out of a deck (1) is hooked in a deck (1) at a front side (28) of the deck (1), which is located within a first shoring level (I), preferably in an insertion position, which is provided for insertion respectively hanging up of a deck, defined by horizontal shoring struts (27)—particularly two opposed shoring struts (27)—in order to allow providing a horizontal area indented to be accessible, and in a second step, the lifting and holding tool (20) is hanged up on a particularly horizontal shoring strut (27) of a next higher second shoring level (II) such that the hooked in front side (28) of the deck (1) is hold by the lifting and holding tool (20) temporarily in an assembly distance (30) above the intended insertion position of the first shoring level (I) in a slanting intermediate assembly position not intended to be accessible, wherein the assembly distance (30) is particularly smaller than the distance between the first shoring level (I) and the second shoring level (II). A very easy and safe assembly and disassembly can thereby be achieved.
申请公布号 US2016123023(A1) 申请公布日期 2016.05.05
申请号 US201514926456 申请日期 2015.10.29
申请人 Hünnebeck GmbH 发明人 Becker Michael
分类号 E04G5/00;E04G1/14;E04G7/30 主分类号 E04G5/00
代理机构 代理人
主权项 1. A method for assembly of a shoring tower (26), which can be used for fabrication or reconstruction of buildings, the shoring tower comprising shoring struts (27) being connected with each other and at least one deck (1)—for providing an area indented to be accessible in a shoring level (0, I, II, IV)—, wherein the deck (1) comprises at least one insertion hook (3) for hanging up on a particularly horizontal shoring strut (27)—at a first front side (28) and an opposite second front side (29), wherein the method includes in a first step, a separate lifting and holding tool (20) being hookable in and out of a deck (1) is hooked in a deck (1) at a front side (28) of the deck (1), which is located within a first shoring level (I), wherein in an insertion position, which is provided for insertion respectively hanging up of a deck, defined by two horizontal opposed shoring struts (27) in order to allow providing a horizontal area indented to be accessible, and in a second step, the lifting and holding tool (20) is hanged up on a horizontal shoring strut (27) of a next higher second shoring level (II) such that the hooked in front side (28) of the deck (1) is hold by the lifting and holding tool (20) temporarily in an assembly distance (30) above the intended insertion position of the first shoring level (I) in a slanting intermediate assembly position not intended to be accessible, wherein the assembly distance (30) is smaller than the distance between the first shoring level (I) and the second shoring level (II).
地址 Ratingen DE
您可能感兴趣的专利