摘要 |
PROBLEM TO BE SOLVED: To provide a scheduling method capable of creating a schedule, which prescribes an execution order and an execution timing of plural tasks based on the execution order of the plural tasks, and capable of giving the selection right of the schedule to a task execution person while presenting the schedules to the task execution person.SOLUTION: The scheduling method includes the steps of: creating a first schedule relevant to the plural tasks based on a first execution order in plural tasks which are prescribed by plural pieces of task information; and creating, when a notification is made relevant to the first schedule, a second schedule which has a content different from the first schedule.SELECTED DRAWING: Figure 5 |