摘要 |
PROBLEM TO BE SOLVED: To provide equipment capable of notifying a user about necessity of inspection.SOLUTION: In a bathroom ventilation drying and heating machine 1A, first integrated time TA1 for monitoring inspection timing of a body device 10A is integrated as actual operation time/number-of-times information DA and stored in a body storage part 82, at power-on. In addition, an operation is performed, second integrated time TA2 for monitoring inspection timing of a maintenance target component for a fan motor 21 and the like is integrated and stored in the body storage part 82. The second integrated time TA2 is reset by component replacement, and notification of the inspection timing of the component can be properly provided. |