发明名称 CEMENTING METHOD ALLOWING INITIAL LINER TOP PRESSURE INTEGRITY CONFIRMATION
摘要 Cementing takes place after a hanger (38) and seal (39) are set to first insure the pressure integrity of the connection between the string to be cemented and the existing tubular. Cementing top down or bottom up is envisioned with either displaced fluid returning toward the surface in a crossover tool (25-29) or with the displaced fluid squeezed into the formation. A work string manipulates the crossover for reversing out after cementing. For running in a valve assembly (1, 2) is held open to permit circulation. Work string manipulation allows at least one valve that keeps the cement in the annulus to close and at least one other valve to close that keeps the reverse fluid from leaving the cemented tubular to allow such flow to return to the crossover and out to the surface. Valve release can be done with a pressure responsive sleeve instead of a stinger (100) on the running string.
申请公布号 WO2016060570(A1) 申请公布日期 2016.04.21
申请号 WO2015NO50190 申请日期 2015.10.14
申请人 ARCHER OILTOOLS AS 发明人 SPONCHIA, BARTON;NORHEIM, LARS;HRABOVSKY, BRETT
分类号 E21B33/14 主分类号 E21B33/14
代理机构 代理人
主权项
地址