摘要 |
A waterborne facility on a body of water includes a primary spoolable pipe and a pump. The end of the primary spoolable pipe may be guided from the waterborne facility to a location proximate to a selected site. The pump may be used to discharge a flowable material through the primary spoolable pipe. The waterborne facility may include a ready-mix concrete preparation system. However, the waterborne facility may deliver any flowable material to a selected site, which may be a land surface, underground, on a water surface, or underwater. Illustrative flowable materials include seawater, grout, cement, and sediment/mud. |