发明名称 APPARATUS FOR THE CONTINUOUS HOT-DIP COATING OF METAL STRIP
摘要 The invention relates to an apparatus for the continuous hot-dip coating of metal strip, preferably steel strip, comprising a melting bath vessel, a snout, which opens in the melting bath vessel, for introducing a metal strip, which is heated in a continuous furnace, into the melting bath in protective gas, and a deflecting roller, which is arranged in the melting bath vessel, for deflecting the metal strip, which is entering the melting bath, in a direction pointing out of the melting bath, wherein that end of the snout which is dipped into the melting bath has at least one runoff chamber which is bounded inward by an overflow wall, downward by a floor and outward by the wall of the snout, wherein the overflow edge of the overflow wall lies at least in sections below the melting bath surface, and wherein a suction line with a pump is connected to the runoff chamber, characterized in that the runoff chamber is provided with at least one through opening through which liquid molten metal can flow out of the melting bath into the runoff chamber, wherein the at least one through opening is arranged lower than the overflow edge.
申请公布号 US2016102393(A1) 申请公布日期 2016.04.14
申请号 US201414787216 申请日期 2014.04.04
申请人 THYSSENKRUPP STEEL EUROPE AG 发明人 SCHAFFRATH Norbert;MÜLLER Thorsten;MACHEREY Friedhelm;NOTHACKER Gernot;RÜBENSTRUNK Tim
分类号 C23C2/00;C23C2/40 主分类号 C23C2/00
代理机构 代理人
主权项 1. An apparatus for the continuous hot-dip coating of metal strip, preferably steel strip, comprising: a melting bath vessel, a snout, which opens in the melting bath vessel, for introducing a metal strip, which is heated in a continuous furnace, into the melting bath in protective gas, and a deflecting roller, which is arranged in the melting bath vessel, for deflecting the metal strip, which is entering the melting bath, in a direction pointing out of the melting bath, wherein that end of the snout which is dipped into the melting bath has at least one runoff chamber which is bounded inward by an overflow wall, downward by a floor and outward by the wall of the snout, wherein the overflow edge of the overflow wall lies at least in sections below the melting bath surface, and wherein a suction line with a pump is connected to the runoff chamber, characterized in that the runoff chamber is provided with at least one through opening through which liquid molten metal can flow out of the melting bath into the runoff chamber, wherein the at least one through opening is arranged lower than the overflow edge.
地址 Duisburg DE