摘要 |
PROBLEM TO BE SOLVED: To simplify construction of a sleeve penetration part of a building.SOLUTION: In a construction method of a sleeve penetration part of a building, a sleeve 20 is provided in a through hole 19 of an outer wall 10 (a structure with a through hole) of a building A. An opening 29 of an end part of the sleeve 20 is covered by a flexible cover part 31 of a cap material 30. An annular and expandable rim string 32 of a periphery of the cover part 31 is elastically locked on an entire periphery of the end part of the sleeve 20.SELECTED DRAWING: Figure 1 |