发明名称 Polymer bag grouting method for repairing settlement of underground pipelines
摘要 A polymer bag grouting method for repairing a settlement of an underground pipeline includes steps of: (1) detecting a settled pipeline section and determining a grouting plan; (2) drilling holes for containing bags; (3) placing the bags into the holes; (4) injecting a polymer material into the bags; (5) uplifting the settled pipeline section; and, (6) filling a cavity and reinforcing a soft soil layer. The polymer material is a non-water reacted two-component polymer material. The method provided by the present invention has advantages of rapidness, small cut, light mass, high tenacity, economy and durability. The method is advanced, highly-efficient, economical and practical and able to rapidly repair the settlement of the pipeline section through uplifting. The method of the present invention is successfully applied to multiple projects of uplifting the underground pipelines, showing great economic and social benefits and a wide development and application prospect.
申请公布号 US2016102782(A1) 申请公布日期 2016.04.14
申请号 US201514969474 申请日期 2015.12.15
申请人 SAFEKEY Engineering Technology(Zhengzhou), Ltd. 发明人 Wang Fuming;Zhong Yanhui;Shi Mingsheng;Fang Hongyuan;Wang Xiaoliang
分类号 F16L1/10;F16L1/036;F16L55/18;F16L3/00 主分类号 F16L1/10
代理机构 代理人
主权项 1. A polymer bag grouting method for repairing a settlement of an underground pipeline, wherein in order to repair the settlement of the underground pipeline, a settled pipeline section is uplifted, and a polymer material is injected into soil below the pipeline to fill a cavity caused by uplifting the settled pipeline section and to reinforce a soft soil layer surrounding the settled pipeline section; the polymer bag grouting method comprises steps of: (1) completely detecting the underground pipeline with a ground penetrating radar or a closed circuit television, and determining a location of the settled pipeline section and a settlement value of the settled pipeline section; (2) drilling a plurality of holes for containing bags, at a bottom part of the settled pipeline section which needs to be uplifted, along a radial direction of a settling end of the settled pipeline section; (3) placing first grouting pipes respectively at an opening of each of the bags; fixing the opening of each bag on the respective first grouting pipe by a circular hoop; and placing each of the bags which is tied up into each of the holes; (4) injecting the polymer material, which is a two-component expansive polymer material, successively into each of the bags by the respective first grouting pipes; (5) rapidly expanding and solidifying in the bags, by the polymer material, so as to generate a huge expansive force to uplift the settled pipeline section; (6) drilling a plurality of grouting holes at middle positions between each two holes, wherein each grouting hole has a diameter of 1.6 cm and is so deep as to penetrate a wall of the settled pipeline section; and inserting second grouting pipes respectively into the grouting holes; and (7) injecting the polymer material to the cavity outside the pipeline by the second grouting pipes; rapidly expanding and solidifying after reacting, by the polymer material, so as to fill the cavity caused by uplifting the settled pipeline section and effectively reinforce the soft soil layer surrounding the settled pipeline section.
地址 Zhengzhou CN