发明名称 HYBRID CONSTRUCTION MACHINE
摘要 PROBLEM TO BE SOLVED: To properly control capacity of a hydraulic pump and torque of a generator motor.SOLUTION: A controller 24 executes capacity command correction processing T for correcting a capacity command of a hydraulic pump 14 in a state of setting torque of a generator motor 20 to 0. The controller 24 also calculates a correction value of a torque command for approaching torque set in response to the torque command to target torque, based on the relationship between residual torque except for torque of the hydraulic pump 14 and an actually outputted torque command among already-known engine torque, in a state of outputting the torque command and a capacity command after correction so that the sum total of the torque of the hydraulic pump 14 and the torque of the generator motor 20 becomes the already-known engine torque, and executes torque command correction processing U for correcting the torque command based on the correction value.SELECTED DRAWING: Figure 4
申请公布号 JP2016053282(A) 申请公布日期 2016.04.14
申请号 JP20140180474 申请日期 2014.09.04
申请人 KOBELCO CONTSTRUCTION MACHINERY LTD 发明人 KAMIMURA YUSUKE;YAMAZAKI YOICHIRO;YOSHIHARA HIDEKI
分类号 E02F9/20;E02F9/22;F02D29/00;F02D29/04;F02D29/06 主分类号 E02F9/20
代理机构 代理人
主权项
地址