发明名称 Apparatus and a method for controlling power supply and demand
摘要 According to one embodiment, an apparatus sends a request to adjust a power consumption to a plurality of request targets, based on power supply and demand. A minimum adjustment time of each request target is stored. The minimum adjustment time is an interval between a time when a request target receives the request and a time when the request target starts to adjust the power consumption. If an estimation value of the power supply is different from an estimation value of the power demand at a first time to start to adjust, at least one request target is selected from the request targets by using the minimum adjustment time. The at least one request target is acceptable for the request at a second time as a predetermined time prior to the first time. A first adjustment amount to the at least one request target is calculated until the second time.
申请公布号 US9310785(B2) 申请公布日期 2016.04.12
申请号 US201313944030 申请日期 2013.07.17
申请人 Kabushiki Kaisha Toshiba 发明人 Otsuki Tomoshi;Hayashi Hisashi
分类号 G05B13/02;H02J3/00 主分类号 G05B13/02
代理机构 Oblon, McClelland, Maier & Neustadt, L.L.P 代理人 Oblon, McClelland, Maier & Neustadt, L.L.P
主权项 1. An apparatus for sending a request to adjust a power consumption to a plurality of request targets, based on power supply and demand, comprising: a memory unit configured to store a minimum adjustment time of each request target, the minimum adjustment time being an interval between a time when a request target receives the request and a time when the request target starts to adjust the power consumption; a selection unit configured to, if an estimation value of the power supply is different from an estimation value of the power demand at a first time to start to adjust the power consumption, select at least one request target from the request targets by using the minimum adjustment time, the at least one request target being acceptable for the request at a second time, the second time being a predetermined time prior to the first time; and a first calculation unit configured to calculate a first adjustment amount to the at least one request target until the second time.
地址 Minato-ku JP