发明名称 BOILER SYSTEM
摘要 PROBLEM TO BE SOLVED: To suppress variation in a header pressure due to backup combustion of a boiler group in which a continuous control boiler is added to a stage value control boiler group, and to enhance pressure stability.SOLUTION: A boiler system 1 includes: a boiler group 2 in which a continuous control boiler 20B is added to a stage value control boiler group; and a control unit 4 for controlling a combustion state of the boiler group 2. The control unit 4 determines that the continuous control boiler 20B exists in a boiler capable of performing back-up by a first determination unit 41, and performs a back-up instruction for increasing a combustion amount which coincides with a back-up steam amount calculated by a back-up request amount calculation unit 42 with respect to the continuous control boiler 20B. The continuous control boiler 20B which has received the back-up instruction outputs the back-up steam amount by changing a combustion rate on the basis of the instructed combustion amount.SELECTED DRAWING: Figure 1
申请公布号 JP2016050694(A) 申请公布日期 2016.04.11
申请号 JP20140175066 申请日期 2014.08.29
申请人 MIURA CO LTD 发明人 YAMADA KAZUYA
分类号 F22B35/00 主分类号 F22B35/00
代理机构 代理人
主权项
地址