发明名称 Integrated Managed Pressure Drilling Transient Hydraulic Model Simulator Architecture
摘要 A system is described herein for performing off shore field operations. The system includes a number of process measuring devices that measure real-time process data. The system can further include a wellhead stack positioned at a sea floor, where the wellhead stack performs managed pressure drilling (MPD) as part of the field operations. The system can also include a dynamic process module executing on a hardware processor and providing first real-time output during the MPD using the real-time process data, where the dynamic process module includes a first off-the-shelf software package communicably coupled to a first model. The system can further include a dynamic integration engine executing on a hardware processor and receiving a first real-time output from the first model of the dynamic process module.
申请公布号 US2016097240(A1) 申请公布日期 2016.04.07
申请号 US201414507244 申请日期 2014.10.06
申请人 Ren Henry H.;Jain Amitkumar C.;Trenery John B.;Straub Dale G.;James Pete A. 发明人 Ren Henry H.;Jain Amitkumar C.;Trenery John B.;Straub Dale G.;James Pete A.
分类号 E21B7/12;E21B33/035;E21B47/12;E21B21/00;E21B21/08;H04L29/08;E21B47/00 主分类号 E21B7/12
代理机构 代理人
主权项 1. A system for performing off shore field operations, the system comprising: a plurality of process measuring devices that measure a plurality of real-time process data; a wellhead stack positioned at a sea floor, wherein the wellhead stack performs managed pressure drilling (MPD) as part of the field operations; a dynamic process module executing on a first hardware processor and providing first real-time output during the MPD using the plurality of real-time process data, wherein the dynamic process module comprises a first off-the-shelf software package communicably coupled to a first model; and a dynamic integration engine executing on a second hardware processor and receiving a first real-time output from the first model of the dynamic process module.
地址 Sugar Land TX US