发明名称 METHOD FOR CONSTRUCTION BACKFILL OF BRIDGE
摘要 The present invention relates to a method to construct a backfill lightweight soil of a bridge with a drainage system. According to the present invention, the method allows in reducing a pressure of the earth applied to an abutment using the lightweight soil as backfill materials; and provides the drainage system for spontaneous drainage by forming horizontal drain layers in a predefined height in the abutment backfill to allow spontaneous drainage, preventing a lasting of residual water for a long time. According to an embodiment of the present invention, the method comprises: (a) forming solum by filling lightweight soil with fluidity in the backfill part on the abutment of the bridge to a predefined height, and curing the same; (b) installing the drainage material in a horizontal direction of abutment on an upper portion of the solum in the predefined height in a longitudinal direction; (c) paving a drainage filter formed by PE film or a non-woven fabric on an upper portion of the drain board; and (d) repeating steps (a) to (c).
申请公布号 KR20160036309(A) 申请公布日期 2016.04.04
申请号 KR20140128366 申请日期 2014.09.25
申请人 SAM BU CONSTRUCTION CO., LTD.;KOREA INSTITUTE OF OCEAN SCIENCE & TECHNOLOGY 发明人 LEE, YONG JAE;YEA, GEU GWEUN;PARK, SANG WON;KIM, HONG YEON;YOON, GIL LIM;KIM, SUN BIN
分类号 E01D19/00;E02D29/02 主分类号 E01D19/00
代理机构 代理人
主权项
地址