摘要 |
PROBLEM TO BE SOLVED: To provide a slab curing method capable of reducing construction costs by shortening a construction period.SOLUTION: A slab curing method 1 includes: a step S1 of placing concrete for a slab 10; a step S2 of providing a reference line 20 for skeleton work on a surface of the slab 10; a step S3 of setting an area, which includes a column reinforcement 12 elongated upward from the surface of the slab 10, as a predetermined area A and providing an interception member 13 by surrounding an area, except the predetermined area A, of the surface of the slab 10; and a step S4 of submerging the slab 10 by infilling water into the area surrounded by the interception member 13. |