发明名称 DETERMINING STATUS OF ELECTRIC POWER TRANSMISSION LINES IN AN ELECTRIC POWER TRANSMISSION SYSTEM
摘要 The present application discloses systems and methods to determine loss of at least one electric power transmission line in an electric power transmission system. In various embodiments, a system consistent with the present disclosure may include an electrical parameter monitoring subsystem configured to receive electrical parameter measurements and to determine a change of the electrical measurements. An analysis subsystem may determine whether a change in the electrical measurements is indicative of loss of at least one transmission line and may calculate a number of transmission lines lost based on the change. In some embodiments, a remedial action subsystem may be configured to implement a remedial action in response to loss of at least one transmission line. The number of transmission lines lost may be determined based on an angle difference ratio and a power ratio between two buses in electrical transmission system.
申请公布号 US2016084893(A1) 申请公布日期 2016.03.24
申请号 US201414493631 申请日期 2014.09.23
申请人 Schweitzer Engineering Laboratories, Inc. 发明人 Gubba Ravikumar Krishnanjan;Upreti Ashish;Nayak Bharath;Korkmaz Yusuf Zafer
分类号 G01R21/00;G01R31/02;G01R19/00 主分类号 G01R21/00
代理机构 代理人
主权项 1. A system configured to determine loss of at least one electric power transmission line in an electric power transmission system, the system comprising: an electrical parameter monitoring subsystem configured to: receive a first plurality of electrical parameter measurements taken at a first location over a period of time;receive a second plurality of electrical parameter measurements taken at a second location over the period of time; anddetermine a change in the first plurality of electrical measurements and the second plurality of electrical measurements over the period of time; an analysis subsystem configured to determine that the change is indicative of loss of at least one transmission line and to calculate a number of transmission lines lost based on the change; and a remedial action subsystem configured to implement a remedial action in response to loss of at least one transmission line.
地址 Pullman WA US