摘要 |
PROBLEM TO BE SOLVED: To provide a system capable of easily creating a test schedule without any omission or waste, while taking account of information related to a job necessary for working out the test schedule, information related to a sub system, the cooperation of which should be checked, and conditions related to verification order thereof.SOLUTION: The schedule support system includes: a storage device 1 in which a test case database 1a, a verification item database 1b, a document information database 1c, a correction resource database 1d, a job information database 1e, and a business work schedule database 1f are structured; a processing device 2; an input device 3; and an output device 4. The processing device 2 comprises: retrieval means 2a for extracting prescribed information from the databases; schedule creation means 2b for creating a test schedule; and control means 2c for controlling operations of the respective devices. |