发明名称 設備点検計画支援装置及びプログラム
摘要 PROBLEM TO BE SOLVED: To set a priority order for executing inspection with respect to facilities without generating an abnormality sign detection model.SOLUTION: A facility inspection plan support device includes: a map generation section 12 for generating a feature amount map of all facilities 1 as objects on the basis of facility state data of all the facility 1; a normal range setting section 13 for setting a normal range where the facilities 1 normally operated are estimated to be mapped onto the feature amount map in response to a normal range setting request; a transition extraction section 14 for extracting positional transition of each facility mapped onto the feature amount map for each of the facilities 1 on the basis of the facility state data of each of the facilities 1 collected by scheduled time processing; a prediction time calculation section 15 for predicting the date and time when each of the facilities 1 falls out of the normal range on the feature amount map on the basis of the positional transition; and a priority order setting section 16 that refers to the date and time predicted and sets a priority order for executing inspection with respect to each of the facilities 1.
申请公布号 JP5892867(B2) 申请公布日期 2016.03.23
申请号 JP20120127106 申请日期 2012.06.04
申请人 三菱電機ビルテクノサービス株式会社 发明人 堀 淳二;坂上 聡子
分类号 G06Q50/10 主分类号 G06Q50/10
代理机构 代理人
主权项
地址