<P>PROBLEM TO BE SOLVED: To provide a disposing facility with a roof and a method of constructing the same which shorten a work period in construction, enable drilling work or the like while avoiding rainwater at a rainfall time, and also prevent water leakage in a landfill. <P>SOLUTION: In this landfill facility 1 with the roof, a plurality of pile column structures 5 are erected in a buried area 2. The pile column structure 5 includes a cast-in-place pile 11, and a precast pile 12 is erected above the cast-in-place pile 11. In constructing the landfill facility 1 with the roof, at first the cast-in-place piles 11 are constructed, then, the precast piles 12 are erected while proceeding drilling of the buried area 2. Further, after the precast piles 12 are erected, the covering roof 3 is constructed and the drilling of the buried area 2 is proceeded. <P>COPYRIGHT: (C)2013,JPO&INPIT |