发明名称 杭抜埋戻工法
摘要 <P>PROBLEM TO BE SOLVED: To provide a pile removal and backfill method capable of reducing ground deformation after removing an existing pile left in the ground and filling back the cave left and reducing a construction period. <P>SOLUTION: In the method, an outer circumference excavation step of excavating along the outer circumference of an existing pile 12 using an excavation casing, a backfill agent supply pipe mounting step of mounting a backfill agent supply pipe 24 for supplying a backfill agent 30 with fluidity to the excavated outer circumference of the existing pile 12 and an existing pile drawing up and backfilling step of filling a pile removal cave with the backfill agent 30 by drawing up the existing pile 12 while supplying the backfill agent 30 via the backfill agent supply pipe 24 are performed. Drawing up the existing pile 12 while supplying the backfill agent 30 thus allows the pile removal cave to be directly filled with the backfill agent 30 without forming an air gap in the pile removal cave, resulting in reduced ground deformation. <P>COPYRIGHT: (C)2012,JPO&INPIT
申请公布号 JP5890606(B2) 申请公布日期 2016.03.22
申请号 JP20100260870 申请日期 2010.11.24
申请人 株式会社江機 发明人 宮地 伸一;清水 明男
分类号 E02D9/02;E02D13/00 主分类号 E02D9/02
代理机构 代理人
主权项
地址