发明名称 RELEASE TEMPLATE
摘要 A project change control record in a release template controls the release of a code change from a change control platform into a test environment. The change control platform receives the code change from a developer. The change control platform applies the code change to the test environment only if the corresponding project change control record exists in the release template and a project corresponding to the code change has an approved status in a project management platform.
申请公布号 US2016077953(A1) 申请公布日期 2016.03.17
申请号 US201414488899 申请日期 2014.09.17
申请人 VERIZON PATENT AND LICENSING INC. 发明人 Bielski Joseph M.
分类号 G06F11/36;G06F9/44 主分类号 G06F11/36
代理机构 代理人
主权项 1. A system comprising: a test environment configured to test one or more applications; a project management platform configured to manage a status for each of one or more projects, each project corresponding to a code change to be applied to one or more a change control platform configured to: receive each code change from a developer; andapply each code change in the test environment; a processor; a memory coupled to the processor; and a release template data structure stored in the memory for holding project change control records, each project change control record, when included in the release template data structure, comprising a project identifier field, wherein: for each respective project: the project management platform is further configured to assign an approved status as the status for the respective project upon receipt of an indication of approval for the respective project from an application development manager, the indication of approval being received after receipt of a notification from the developer that the code change corresponding to the respective project has been submitted to the change control platform; andfor each received code change: the change control platform is further configured to apply the received code change in the test environment only if a set of conditions is met, the set of conditions comprising: the project corresponding to the received code change has been assigned an approved status by the project management platform; andat least one project change control record in the release template data structure contains a project identifier value corresponding to the received code change as an indication that the received code change is authorized for release.
地址 Arlington VA US