发明名称 PEDESTRIAN BRIDGE DESIGN AND CONSTRUCTION METHOD USING READY MADE H-BEAM WITH PRESTRESSED FORCES ON COLUMN INSIDE CONNECTION
摘要 The present invention relates to a construction method of a bicycle-pedestrian bridge where bicycles and persons use. The present invention suggests a method for connecting a column part to a coping by fitting a circular pipe to the top of the column part to facilitate construction while bearing a load applied to the bicycle-pedestrian bridge and suggests a method for completing the bridge by manufacturing the coping using a material having easy availability. Thus, the present invention improves the appearance of the bridge as bolts and nuts for connecting the column to the coping do not exist in the outer side of the column and simplifies the construction of the bridge.
申请公布号 KR20160026213(A) 申请公布日期 2016.03.09
申请号 KR20140114310 申请日期 2014.08.29
申请人 CHEONG WON ENGINEERING CO., LTD. 发明人 MOON, BYEONG OK
分类号 E01D21/00;E01D19/02 主分类号 E01D21/00
代理机构 代理人
主权项
地址