发明名称 PULLING METHOD AND STRUCTURE OF JACK UP RIG FROM SEAFLOOR
摘要 A construction method for drawing a jack-up rig is disclosed. The construction method for drawing a jack-up rig, according to an embodiment of the present invention, comprises: a step of inserting piles into a seabed; a step of filling the piles with sand in a certain height; a step of preparing sand piles by removing the piles; and a step of arranging a spud can of a jack-up rig arranged to support a ship or an offshore structure from the seabed on the sand piles inserted into the seabed by the piles. Therefore, the present invention easily performs the drawing work of the jack-up rig from the seabed.
申请公布号 KR20160023215(A) 申请公布日期 2016.03.03
申请号 KR20140109173 申请日期 2014.08.21
申请人 DAEWOO SHIPBUILDING & MARINE ENGINEERING CO., LTD. 发明人 WON, JONG HWA;PARK, JONG SIK;LEE, JOON MO
分类号 B63B35/44;E02B17/04 主分类号 B63B35/44
代理机构 代理人
主权项
地址