发明名称 |
METHOD FOR VESSEL MOUNTING INSTALLED IN TOPSIDE MODULE OF FLNG AND THE FLOATING OFFSHORE STRUCTURE WITH VESSEL MOUNTING BY THE SAME |
摘要 |
The present invention relates to a method for mounting a vessel installed in a topside module of FLNG, which is to prevent an accident in advance by minimizing a wire work and a high place work required for a welding work and simplifying an installation construction method since a loose vessel is supplied and mounted on the topside module after a part of whole lengths of a trunnion installed in the vessel is cut and since only the loose trunnion is welded. The method for mounting a vessel in a topside module includes: a step (S100) of installing a side beam (200) without the loose topside module (100); a step (S200) of mounting the vessel (300) without the loose side beam (200) and a loose lateral guide (210) installed in the topside module (100); and a step (S300) of welding a loose part of the trunnion (310) after mounting the vessel (300). |
申请公布号 |
KR20160023059(A) |
申请公布日期 |
2016.03.03 |
申请号 |
KR20140108778 |
申请日期 |
2014.08.21 |
申请人 |
DAEWOO SHIPBUILDING & MARINE ENGINEERING CO., LTD. |
发明人 |
HWANG, CHEON SEOK;CHOI, YONG KWAN |
分类号 |
B63B35/44;B63B9/06 |
主分类号 |
B63B35/44 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|