发明名称 |
AIR-CONDITIONING CONTROL SYSTEM AND METHOD |
摘要 |
There are provided a heat load prediction unit (32) that predicts a change over time of a heat amount to be processed by air-conditioning equipment (12), an operation plan creation unit (33) that previously creates an operation plan of the air-conditioning equipment (12) to reduce an evaluation index under a first restrictive condition that a total process heat load be maintained at the same level or within the range of a predetermined amount of difference and that the temperature in a room be maintained within a predetermined comfortable temperature range, and an operation plan correction unit (34) that corrects the operation plan during execution of control of the air-conditioning equipment (12) in accordance with the operation plan. If an actually measured temperature measured by a temperature sensor is different from a predicted temperature predicted by the operation plan creation unit (33) at the time of creation of the operation plan, the operation plan correction unit (34) predicts a change over time of the temperature in the room, and corrects the operation plan to minimize the evaluation index under the first restrictive condition, with a second restrictive condition set as that an error between a predicted temperature predicted by the operation plan correction unit (34) and the predicted temperature predicted by the operation plan creation unit (33) be maintained within a predetermined allowable fluctuation range at one time or a plurality of times in the correction application period. |
申请公布号 |
EP2990734(A1) |
申请公布日期 |
2016.03.02 |
申请号 |
EP20140788634 |
申请日期 |
2014.02.06 |
申请人 |
MITSUBISHI ELECTRIC CORPORATION |
发明人 |
YAMAMOTO, TAKAYA;UNO, YOSHITAKA;MOTODANI, MIO;MAITANI, HIROSHI;NAKAJIMA, OSAMU |
分类号 |
F24F11/02;F24F11/00;G05D23/19 |
主分类号 |
F24F11/02 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|