摘要 |
<P>PROBLEM TO BE SOLVED: To provide a building construction method capable of efficiently executing a predetermined construction work by allowing a service vehicle to enter inside a foundation section without using synthetic resin foam or other reinforcement member. <P>SOLUTION: In a building construction method, an execution plan of a continuous footing 6 is developed separately for a general section 9 as well as an embedding section 11 where a service vehicle 7 is planned to enter, and an embedded foundation 17 with a level of an upper surface 17c thereof equal to a ground surface S is planned in the embedding section 11. Afterward, the building construction method: executes a predetermined construction work to construct a building 1 by allowing the service vehicle 7 to enter inside a foundation section 3; moves the service vehicle 7 outside the foundation section after completing the predetermined construction work; and successively extends an additional rising section 19 on the upper surface 17c of the embedded foundation 17 to support a floor 4 as well as an outer wall 5. Then, the floor 4 as well as the outer wall 5 are installed to the additional rising section 19. <P>COPYRIGHT: (C)2013,JPO&INPIT |